Please see the attached diagram for road closure to repair caved-in storm drains and repaving from 8/20-8/22. There will be no access for traffic or pedestrians. Emergency vehicles will have to use the Adult Ed ramp for access to the back of the hospital and Peds Ed. Delivery vehicles will need to access the back of the hospital from the New Scotland Ave west entrance.
top of page
bottom of page
留言